top of page
Santeco Construction
Supplies and Services
Replacement of Heat Exchanger | Preventive Maintenance & Repair | Leak Repair |
---|---|---|
Replacing Tube in Tube in Hydromax | Heatpump Recharging | Replacing Evaporator for Heatpump |
Newly Replaced Heat Exchanger | Before Cleaning | After the Preventive Maintenance |
Overhauling of Heatpump | Heat Pump Repair | Preventive Maintenance/Leak Repair |
Replacement of Heat Exchanger | New Heat Exchanger from Hydromax | Repair of Pecol Heatpump from Jett |
Replacing of Taco Pump to Hydromax Pump | Replacement of Heat Exchanger of Pecol | Replacement of Heat Exchanger of Pecol |
Preventive Maintenance | Dismantling of Old Heatpump | Replacement of Anode Rod Protection |
Replacement of Heat Exchanger of Pecol | Lim Boracay Preventive Maintenance | Lime Boracay Preventive Maintenance |
Tsuneshi Cebu Preventive Maintenance | Re-wiring and Cleaning | |
Hot Water Pump Cleaning | System Flushing | Hydromax Controller on a different Brand |
Heat Pump Repair in Novalodge Baguio | Leak Repair | Replacement of Hydromax Pump |
Overhauling of Heat Pump - The Farm | The Farm - San Benito | The Farm - San Benito |
The Farm - San Benito | The Farm - San Benito | The Farm - San Benito |
The Farm - San Benito | The Farm - San Benito | The Farm - San Benito |
The Farm - San Benito | The Farm - San Benito | The Farm - San Benito |
The Farm - San Benito | The Farm - San Benito | GRT Cebu Pump Replacement |
GRT Cebu Pump Replacement | Fan Blade Replacement | Fan Motor Replacement |
554 | 556 | 557 |
577 | 551 | Hydromax LCD Replacement |
Hydromax Hot Water Pump |
bottom of page